Implementation Period
October 2008 – April 2009
Footprint
Kazakhstan
Client
Governor of Eastern Kazakhstan Oblast
Position Held
Project Director
Main Project Features
The study aimed to justify the feasibility of the construction of a wellness centre at Bukhtarma water reserve in Ulan district of the Eastern Kazakhstan Oblast (up to 500 people). The scope included geological and topographical surveys, preliminary architecture design of the facility, utilities, and infrastructure, assessment of the cost of construction, and environmental impact assessment.
Activities Performed
Led local team comprising 8 consultants to execute the works and deliver feasibility study report with the approval of the State Design Expertise, local authorities, and the Ministry of Environment, in full compliance with the norms and standards and to the satisfaction of the client. Provided expertise as project economist and prepared institutional, investment, risk assessment, and social sections of the report.